Panglao airport committee wants runway bidding soonest
The Panglao International Airport Development Project (PIADP) has been pushed for the runway bidding, by the Inter-Agency Committee. This is a move that would finally make visible the development of the dream airport.
In its development timetable provided by the PIADP secretariat, the preparation of the project’s detailed engineering works would be on from February to July. This was bared by Governor Erico Aumentado in his Governor’s Report.
The runway and its allied facilities would cover some 2.5 kilometers and would be designed in such a way that it can be upgradeable to accommodate the biggest plane of the Airbus fleet. Aumentado says that the runway would soon be extended to 3.8 kilometers but the initial bidding would yet cover the construction of 2.5 kilometer strip.
Aumentado insisted that the airport should be operational by December 2010, even if it would still be operating on temporary terminal hub, a tent city as he proposed. (PIA)
http://www.pia.gov.ph/?m=12&fi=p090509.htm&no=49
Most popular tags: Aquino Administration Armed Forces of the Philippines Armed Forces of the Philippines (AFP) barangay elections Bohol Bohol crimes bohol local news Bohol news Bureau of Internal Revenue comelec Commission on Elections Commission on Elections (Comelec) daily Department of Agriculture Department of Education department of foreign affairs Department of Health Department of Health (DOH) Department of Justice Election 2010 Governor Edgar Chatto Malacanang MILF Mindanao Moro Islamic Liberation Front Moro Islamic Liberation Front (MILF) news noynoy aquino overseas filipino workers PAGASA peace talks PGMA Philippine economy Philippine National Police Philippine National Police (PNP) Philippine news Philippines PNP President Benigno "Noynoy" Aquino III President Benigno Aquino III PRESIDENT Benigno S. Aquino III President Gloria Macapagal-Arroyo Reproductive Health Bill Supreme court Tagbilaran City












